Sizing Charts
|
![]() |
Bloom TopAll measurements are done in inches and are measured around. Measurements of garment are taken fully expanded. Subtract 5" from bust and waist for elasticized sizing. Bloomer top is meant to have a loose fit. If you'd like a more form fitting top we suggest sizing down. |
||||
Size |
Bust |
Waist | Length | Sleeve | |
S | 36 | 38 | 10 | 10 | |
M | 38 | 40 | 10 | 10 | |
L | 40 | 42 | 10.5 | 10 | |
XL | 43 | 45 | 11 | 10 | |
2X | 46 | 48 | 11.5 | 10 | |
3X | 52 | 54 | 11.5 | 10 |
Bloom ShortsAll measurements are done in inches and are measured flat. Hip Width is measured from left to right side from the most expanded part of curve. Length is measured from top of waistband to bottom of short. Leg width is measured from left to right of bottom leg hole fully expanded. Subtract 4" for elasticized bottom leg measurement. All shorts feature a rise of 15" |
![]() |
||||
Size | Waist | Hip Width | Inseam | Length | Leg Width |
S | 24-26 | 23 | 4 | 18.5 | 6 |
M | 28-30 | 25 | 4 | 18.5 | 8 |
L | 32-34 | 27 | 4.5 | 19 | 10 |
XL | 34-36 | 29 | 4.5 | 19 | 12 |
2X | 40-42 | 31 | 4.5 | 19 | 14 |
3X | 44-46 | 33 | 4.5 | 19 | 16 |
![]() |
Corset TopAll measurements are done in inches. Bust is from with back panels touching. Size can be adjusted up using string and leaving gap. For a tighter fit, size down. Additional sizes can be made! Please send us an email to get your measurements! |
||||
Size |
Bust |
Shoulder to Shoulder |
Length | ||
XS | 31.5 | 11 | 9.5 | ||
Sm | 34 | 12 | 10 | ||
M | 36 | 13 | 10.5 | ||
L | 37 | 14 | 11 | ||
Xl | 38.5 | 15 | 11 | ||
1x | 41 | 16.5 | 12 |
All sizing is meant to reflect genderless sizing. Pantano Clothing is happy to customize sizing within reason (ie adjusting waistbands to exact measurement or length of items). If you'd like your product customized to your measurements please visit our contact us page. Include your order number along with your requests to inquire. Please make sure your customization request is done within three days of initial order date as construction may have already begun past this time.